Permit Requirements

Residential Building Permit
  1. Application
  2. (3) Sets Plans
  3. (2) Foundation Plans
  4. (3) Site Plans
  5. (2) Tree surveys - size, species, signature, and structure with legend indicating trees to be removed and trees staying
  6. (2) Drainage plans with signature
  7. (2) copies - Engineers Letter
  8. (2) Truss Plans (if using truss)
  9. ICC Evaluation Report & Installer Certification (if using Stucco)
  10. (4) Pictures of Lot - property lines (make sure address on pictures)
  11. If brick on wood - need to be engineered
  12. Residential energy Code Review Sheet along with appropriate data
Retaining Walls Permit
  1. Application
  2. (2) Stamped Surveys with location/height of wall
  3. If 4' and over in height - require construction plans prepared by a Certified Professional Engineer
  4. When complete (4' and over) need engineers letter
Fence Permit
  1. Application
  2. (2) Stamped Surveys with location and height of fence marked
  3. Total Linear footage of fence being built
Pool/Spa Permit
  1.  Application
  2. (3) Sets Plans with Electric Co. stamp
  3. (3) Stamped Surveys showing pool and setbacks
  4. Notarized letter stating where dirt will be moved to outside City limits
  5. Letter signed by homeowner and pool contractor. Pool/Fence requirements
Addition (Add-On) Permit
  1. Application
  2. (3) Sets plans
  3. (3) Stamped Surveys with addition marked on
  4. Residential Energy Code Review Sheet
  5. (2) Engineered Foundation plans - stamped
NOTE: Other documentation may be needed if the City deem necessary

Commercial - New Construction Permit
  1. Application
  2. (3) Sets Plans - Stamped engineered plans mechanical, electrical, plumbing and structural
  3. (2) Foundation plans
  4. 2009 Energy Code Compliance Sheet - ComChek and/or supporting documentation
  5. (2) Site Plans
  6. (2) Landscape Plans
  7. TDLR Letter - for each structure
  8. Engineered Foundation Design Letter
  9. (2) Sets Fire Sprinkler Plans
  10. On stand alone buildings - Need architectural site plan on either .dwg or .jpeg file.
Commercial - Finish Out Permit
  1. Application
  2. (3) sets plans - stamped engineered plans mechanical, electrical, plumbing
  3. Energy Code Compliance Sheet - ComChek and/or supporting documentation
  4. TDLR letter
  5. Asbestos survey
  6. Each subcontractor, electrical, plumbing, mechanical, must be registered and also pull their own permit